Search
Did you mean asset management policy?
Results
Fully-matching results
-
Risk Assessment Template DOC (253k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0028/209494/F015-Risk-Assessment-Template.doc1 Nov 2023: Risk Assessment &Management plan. Risk Assessment &Management plan. Risk Matrix. Location:. ... Damaged/Broken Equipment. 17. Staff Training. 18. Management of risks association with Covid 19.
-
Standard Conditions - Material Change of Use DOCX (670k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0021/7194/Standard-Conditions-MCU.docx9 Jan 2024: OR. Prior to the commencement of the use. 24. Car Parking Management Plan. ... The GDMP must also consider and include an Acid Sulphate Soil Management Plan.
-
Standard Conditions - Operational Works DOCX (637k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0011/4502/Standard-Conditions-OPW.docx9 Jan 2024: ii) Prescribed fee. (iii) Traffic Management Plan prepared by a suitably qualified professional detailing the traffic management measures put in place to manage all roadworks including pedestrians, cyclists and vehicles in ... The Traffic Management Plan
-
Standard Conditions - Reconfiguring a lot DOCX (655k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0022/7195/Standard-Conditions-RAL.docx9 Jan 2024: Used where a Bushfire Management Plan has been accepted and approved by Council. ... Where a Bushfire Management Plan has been accepted. 33. Rock Breaking, Drilling and Piling.
-
Commercial permit risk assessment form DOC (253k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0025/14866/F015-Commercial-Permit-Risk-Assessment-Template.doc30 Nov 2022: Risk Assessment &Management plan. Risk Assessment &Management plan. Risk Matrix. Location:. ... Damaged/Broken Equipment. 17. Staff Training. 18. Management of risks association with Covid 19.
-
Standard Conditions - Advertising Devices DOCX (629k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0018/7191/Standard-Conditions-Advertising.docx9 Jan 2024: b) Prescribed fee;. c) Traffic Management Plan prepared by a suitable qualified traffic professional detailing the traffic management measures put in place to manage all Roadworks including pedestrians, cyclists and vehicles ... The Traffic Management
-
Standard Conditions - Building Works - Code Assessable DOCX (621k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0019/7192/Standard-Conditions-DBW.docx9 Jan 2024: 1. Approved Plans and Supporting Documentation. Condition. The development must generally comply with the plan(s) and supporting documentation referenced in the table below and attached as stamped “Approved Subject to ... Reason. To comply with the
-
Development compliance report DOCX (62k)
https://www.townsville.qld.gov.au/__data/assets/word_doc/0021/7239/Fast-Track-Survey-Plan-Development-Compliance-Report.docx20 Dec 2023: Example Response:. The applicant obtained an OPW permit (OPW24/_____) and the Stormwater Quality Management plans were accepted as part of that application. ... No consent was required. Condition 14 Bushfire Management Plan. A Bushfire Management plan